For investors · land, water, documentation, deal structure
What an investor gets on day one.
Land with a thermal spring cannot be reproduced. Here the land comes with the water studies, the master plan and the conceptual design of phase one. What remains is the deal structure, which is negotiated.
Land
- LocationGata, Bihać, on the Bihać–Cazin road
- Parcelsparcels 324/1, 324/2, 367, 368, 369, 319/1, 319/2 and 332/1, cadastral municipality Donja Gata
- Area83,312 m² (8.3 ha) in eight parcels
- Ownership100% single owner, no co-owners
- Zoninghealth-tourism, energy and agricultural zones
Water
- Springthermo-mineral, 36–37 °C
- BoreholeSB-1, deepening planned
- Yieldadd l/s
- Concessionadd status
Documentation
- StudiesTuzla Mining Institute, 1979–1984 research and borehole SB-1
- Master plancentre programme and general plan
- Conceptual designpool complex, 2014
- Permitsadd status
Deal structure
- Optionsland sale, joint venture or long-term lease
- Scopeentry into phase one or the whole centre
- Amount soughtto add
- Public fundsIPA cross-border cooperation as a supplementary source
How the conversation goes
Introduction
A short call and a site visit: the spring, the terrain, access, surroundings. Before that, this site answers most questions.
Documentation
Full access to the water studies, master plan and conceptual design, under a confidentiality agreement.
Letter of intent
Agreement on the framework: entry phase, deal structure and the due diligence timeline.
Transaction
Legal and technical review, a financial model for phase one and signing.
Let's talk about Gata.
One address for every enquiry: a site visit, access to the documentation or a first conversation about the deal structure. We reply within two working days, in Bosnian or English.