For investors · land, water, documentation, deal structure

What an investor gets on day one.

Land with a thermal spring cannot be reproduced. Here the land comes with the water studies, the master plan and the conceptual design of phase one. What remains is the deal structure, which is negotiated.

Land

  • LocationGata, Bihać, on the Bihać–Cazin road
  • Parcelsparcels 324/1, 324/2, 367, 368, 369, 319/1, 319/2 and 332/1, cadastral municipality Donja Gata
  • Area83,312 m² (8.3 ha) in eight parcels
  • Ownership100% single owner, no co-owners
  • Zoninghealth-tourism, energy and agricultural zones

Water

  • Springthermo-mineral, 36–37 °C
  • BoreholeSB-1, deepening planned
  • Yieldadd l/s
  • Concessionadd status

Documentation

  • StudiesTuzla Mining Institute, 1979–1984 research and borehole SB-1
  • Master plancentre programme and general plan
  • Conceptual designpool complex, 2014
  • Permitsadd status

Deal structure

  • Optionsland sale, joint venture or long-term lease
  • Scopeentry into phase one or the whole centre
  • Amount soughtto add
  • Public fundsIPA cross-border cooperation as a supplementary source

How the conversation goes

  1. Introduction

    A short call and a site visit: the spring, the terrain, access, surroundings. Before that, this site answers most questions.

  2. Documentation

    Full access to the water studies, master plan and conceptual design, under a confidentiality agreement.

  3. Letter of intent

    Agreement on the framework: entry phase, deal structure and the due diligence timeline.

  4. Transaction

    Legal and technical review, a financial model for phase one and signing.

Let's talk about Gata.

One address for every enquiry: a site visit, access to the documentation or a first conversation about the deal structure. We reply within two working days, in Bosnian or English.

E-mail kontakt@aquaparkgata.com